Mantle needs caulk,puddy sand and paint.6 doors and door frames to be caulked puddied sanded and painted 2 are exterior,caulk bathtub,front door is wood needs painted,small windows around front door to be painted,island in kitchen has 12 drawers to be sprayed blue,trim here and there caulked,puddied,sanded and painted,3 window shutters outside to be painted,window trim outside in back to be caulked puddied and painted,cut in around shower and tub,garage door to be painted,stucco around front door to be painted. House Painting Broomfield CO
Peeling paint is a very common paint problem that can be caused either by moisture or poor adhesion. Peeling due to poor adhesion is characterized by the paint peeling and separating from an earlier paint layer (intercoat peeling) or from the substrate, leaving some paint behind. Sometimes, portions of earlier paint layers are visible under the curling, peeling paint layer. Broomfield House Painting

I think it best to measure walls and ceiling areas to be painted. Measuring the floor space only will not give you the actual wall square feet. A wall could be 8’. 10’ or more high. Measuring the floor only could cost you money. If I had a 10×10 x8 high room. Floor space is 100 sq feet but the wall would be 320 sq feet minus door, window and closet. Now if I had the same 10×10 room but 12 feet high. That would be 480 sq ft of wall minus window, door and closet. Using floor square feet of floor only would make your estimate inaccurate. I know some may disagree but that would be the correct way to measure a room for painting. House Painting Broomfield CO
Walls should be wet down before getting scrubbed, then washed with a gallon of water mixed with 1 cup chlorine bleach and 1 cup of either a concentrated, phosphate-free cleaner, such as a trisodium phosphate (TSP) substitute, or Jomax House Cleaner. Working in sections, from the bottom to the top, will avoid streaks. Be sure to rinse walls well before the solution dries. Wood siding and trim should be ready to paint after a day or two of dry weather.
how do i calculate time for this job. is it as simple as your comment above 3x more for difficult jobs like peeling and wood damage, where does cutting in come into play. the area i have is a long narrow section around a top of a building. with the channel siding i have to cut in the top and i cant just do it quick each piece needs to get done individually.

Hi Conaz, good question. There’s a really good breakdown of all painting equipment (cost, supplies list etc.) here . As far as your other costs, I would break it down into categories, similar to how an accountant would do it: Marketing Expense, Insurance/Workers Comp., Gas/Mileage. Once you’ve discovered this monthly overhead you can determine your markup. We always try to make 40-50% gross profit on a paint job before any other expenses. Your net profit will be determined by the size of your business. For example, one painting company with 40 employees may only have a net profit of 10%, but a smaller operation; One owner and one crew may have a net profit of 35%. You should decide beforehand what you want to make per job, factoring in all your costs, and then create a consistent bidding process to make what you want.
Hi Dan, your pricing is definitely going to be on the high end of our pricing tables. Trimming tudor-style jobs can take a long time, especially if you’re cutting in near the body color (painting 3 sides of the trim instead of just the front). The color change is going to increase time even more because you might have to go over the trim a couple times by hand just to cover. I would bid high on this job.
Hi Kadie, when it’s sort of a piecemeal job like you’ve listed, we recommend bringing your head painter to help estimate. Your foreman, or most experienced painter can tell you how long each item will take. For example: Sanding and Painting 6 doors = 4 hours. 3 window shutters = 1.5 hours etc. After itemizing everything with your painter you’ll get a labor total, like 25 hours. And then charge an amount per hour that includes hourly labor, materials and your profit margin. Lets say all your items take 25 hours and you charge $60 per hour (includes labor, paint, and your markup). You would bill the customer 25x$60 = $1,500. This estimating process is recommended when there are many scattered things to be painted and it’s not just a full repaint. Hopefully this helps, Kadie. Broomfield Home Painting
We recently went from being a custom residential painting company to also painting apartments (we have a college town nearby and there is a LOT of off campus student housing). These are often not well taken care of. Most also want brush and roll because of over spray. What would be a good price for a 4 bdrm 2 bath? Or a 5 bdrm, 4.5 bath that has three floors of living space? Thanks. Broomfield House Painting

You’ll spend between $500 and $3,000 or $1 to $3.50 per square foot to paint concrete. However, expect to pay $2 to $7 per square foot since concrete almost always needs a coat of primer first. Double that price if the concrete requires stripping. Concrete is porous. Sealing it not only helps blend foundations and walls with your home’s aesthetic, but also seals it against water. Repairing or resurfacing concrete costs $300 to $500 for every 100 square feet.


When You Screw Up Will you mess up a couple times? Definitely. More than a couple. I have messed up a lot of painting estimates. But every time we mess up (and we still do), we learn from those mistakes and never make the same mistakes twice. Screwing up and failing is how you learn. Be ready to make never-ending tweaks and adjustments to your estimates. There is no way to be in business and not screw up. Learn to embrace those failures, and learn from them. If you do screw up your bid, that’s ok. You have to price yourself incredibly low to actually lose money. So don’t sweat. Just learn. Broomfield Home Painting

hey there, i’ve been painting for years working for a guy who ripped us off at any given moment… but thats another story. anyway, long story short me and my friend are starting up our own business and have not done any estimating before. thanks so much for putting up this great info. i just have a question about where you say square footage. it says 1500 square feet you would charge 1800-3000. my question is, would that be total square footage of the house or wall sqaure footage? I just went to check out a house today that was 1900 square feet that had two bedrooms, two baths, 2 walk in closets and a laundry room and an electrical room with a open concept kitchen living area, with 12 foot ceilings throughout most of the house. so there is alot of walls is what im getting at. not looking for what you would estimate for the house, just wondering if you are taking the square footage of the entire house or the walls? hope to hear from you soon! and thanks again for all the info you already helped us with House Painting Broomfield Colorado
Paint supplies cost anywhere from $10 to $100 or more depending on what you need. Painters will typically provide most of the supplies for a project, but sometimes they will allow you to pay for solely labor if you provide all the materials yourself. You might decide to do a DIY paint job down the road. In which case having these supplies on-hand will save you time and money. Broomfield Home Painting
Generally making a paint estimate is very difficult job yet a necessary one. Understanding key mechanics behind every quote is the basis which might not only enable us to understand nut also do estimation for ourselves. To begin with, we need to understand the basic structure and volume of the work to be undertaken. Along with the nature and type of the paint and skills set required for it must be considered. We should also carefully account for the possible “hard areas” like hose mounts etc. along with other items that are fixed. Estimate for the additional costs for example moving furniture and cleaning services after the job is done should also be added to the estimate. We should also consider the difficulties that are expected to be encountered during work e.g. high structures and ladder-based work. Cost of consumables such as supplies, cleaning tools and other materials to be used in additional capacity are also to be added to the estimate House Painting Broomfield Colorado
×